Project: USACE SWD 10: Design Documenting for Improved Plot Legend and Plot Layer Control
- Phil Weinstein, 4-04-2017

Draft 2 (4-04-2017):

Draft 1 (3-26-2017):

Hours Reported:
(Task assigned on 3-6-2017, 36 hour budget).

Day Hours Total  
3-13 Mon 2.0 2.0  
3-14 Tue 1.25 3.25  
3-15 Wed 1.5 4.75  
3-16 Thu 1.5 6.25  
3-20 Mon 4.5 10.75  
3-21 Tue 6.0 16.75  
3-22 Wed 5.5 22.25  
3-23 Thu 7.0 29.25  
3-24 Fri 7.0 36.25 Draft 1 completed.
3-29 Wed 1.0 37.25 Review meeting with Edie & David
4-03 Mon 7.0 44.25  
4-04 Tue 10.0 54.25 Draft 2 completed. Done.

---