Phil Weinstein, Activity Report, December 2016, edit 1-04-2017 (a) --- Maintenance, Bug Fixing (Total: 71.75) Fixed Bugs: 4.5 -- 5650: Clearing WS after resetting database DMI edit dialog crashes 2.5 -- 5802: Chart timestep slider problem with different model step size 3.0 -- 5808: Mass Balance Summary slot flow units always default to cfs 3.0 -- 5832: Adding empty Periodic Slot as first slot in plot fails assert 4.0 -- 5847: Plot legend height too small when horizontal scrollbar shown 3.0 -- 5855: Periodic Slot dialog Delete Column enabledness problem. 21.0 -- 5860: SCT: Bad data-entry behavior in selected, off-screen cell. 3.0 -- 5861: Locator window reference rectangle is too subtle, light gray. 3.0 -- 5862: SCT column headers not always being set to the correct font. 2.75 -- 5865: Plots in model reports are not scaled correctly, clipped. 4.0 -- 5868: Setting integer Scalar slot w/Slider Script action sets float 0.75 -- Unfiled plot bug: Internal rounding problem building tick marks. Some work was done on these bugs (analysis, filed, assisted): 0.5 -- 5727 (Assisted Bill): Row dates on periodic slots do not import. 1.0 -- 5735: Typing into Edit Account dialog, errors, assertion failures. 8.0 -- 5856: Open Table Slot Dialog: column deletion, phantom GUI column 0.5 -- 5858 (filed) Periodic Slot: Delete Col doesn't adjust numeric headers 2.25 -- 5864: Legend and plot line not same if thickness is greater than 1. 4.0 -- 5873: Problem printing Helvetica font (maybe just on dev. machines) 1.0 -- General Bug Review --- Maintenance, including Unfunded Development (Total: 42.5) 14.0 -- Qt5 Upgrade (Qt 4.8.5 -> Qt 5.5.1) RiverWare GUI Issues 9.0 -- "About" Dialog Revisions / 3rd Party Libary Attributions 8.5 -- FFmpeg deployment and legal issues 1.5 -- Researching STL container class performance issue 9.5 -- Assisting Willard, mostly on bug fix tasks, incl. 5821,5822,5535. --- Funded Development Tasks (Total: 25.75) COE SWD Task 5 Model Report Editor Features 16.25 -- (a and b): HTML file extension filter; automatically add. 9.5 -- (c): Embed images within HTML file, in progress. --- RiverWare Commercial Activities (Total: 0.25) CC Payment and Web Page Support 0.25 -- online payment item configurations --- General Project/Center Activities (Total: 17.25) 1.0 -- Software Meeting (12-12). 1.0 -- General Task Review 3.5 -- RW 7.0 Release Prep: Generation of integrated RPL documentation 0.5 -- RW 7.0 Release Prep: Assist Jessica with GIT 1.75 -- Nov 2016 Activity Report 1.5 -- Nov 2016 Accomplishments Report 1.0 -- Sep 2016 Maintenance Compilation 7.0 -- Bug compilation for FY 2016 Annual Maintenance Report Work Hours: 157.5 hours (19 days) Admin Hours: 8.0 hours (12-27, extra day off "gift" from CU). Total Hours: 165.5 hours (20 days) --- (end) ---